6. Load Filament 装载原材料
1 Check whether the feeding tube is
connected properly.
检查下料管是否都连接好。
2 The pellet (diameter 1.0~5.0mm)
material is loaded into the feeding barrel.
将颗粒(直径1.0~5.0mm)原料装入下料
漏斗中。
3 Fill with material and cover with
barrel cover.
料装满后盖上漏斗盖。
14
    "